Standard Construction Details

SS-PP-1 — Pipe Laying Detail

Standard trench, bedding, and backfill requirements for gravity and force mains, including tracer wire placement and pavement restoration.

SS-E1-1 — E/One Pump Station

Layout for individual grinder pump (E/One) installations showing pump vault, discharge piping, alarm panel, and curb stop/check valve assembly.

SS-MH-2 — Doghouse Manhole

Connection detail for tying new sewer mains into existing lines using a doghouse-style precast manhole with poured-in-place concrete channel.

SS-MH-1 — Standard Manhole

Typical precast manhole detail including benching, frame and cover, gaskets, and construction specs for watertight sewer access points.

SS-LAT-1 — Service Lateral & Cleanout

Standard layout for residential and commercial sewer laterals, showing proper PVC connections, cleanouts, stone bedding, and slope requirements.